It’s also torches and everything after the regulator, which run at much lower pressure. At least in NZ
I think it might be because they’re connected and disconnected regularly so misconnection is a common problem, even with colour coding. Gas work on houses involves actually putting the fittings on pipe and is done by people who should be concentrating more on that rather than on what they’re about to weld/cut.
Requirements often depend on the type of building occupancy and the chance of fire spread to neighboring buildings.